{ tooltip = 'Copied'; setTimeout(() => tooltip = 'Copy Link', 2000); })" :data-tip="tooltip" class="tooltip tooltip-primary tooltip-bottom" class="cursor-pointer" role="button">
Extending and Enhancing the Implementation of the Lifeline Rate, Amending for Sec. 73 of R.A. No. 9136 (Electric Power Industry Reform Act of 2001), as Amended
Download as PDF
Download as Word
My Notes
Highlights
New
Collections
Create a New Collection
Overview
Full Text
{ tooltip = 'Copied'; setTimeout(() => tooltip = 'Copy Link', 2000); })" :data-tip="tooltip" class="tooltip tooltip-primary tooltip-bottom" class="cursor-pointer" role="button">
Details
Case
Agency Issuance Number
Published Date
Extending and Enhancing the Implementation of the Lifeline Rate, Amending for Sec. 73 of R.A. No. 9136 (Electric Power Industry Reform Act of 2001), as Amended
Republic Act No. 11552
May 27, 2021
Case Overview and Summary
Extension and Enhancement of Lifeline Rate Implementation- Extends the implementation of the lifeline rate for qualified marginalized end-users for 50 years, unless further extended by law. (Section 1)
- Defines qualified marginalized end-users as:
a) Household-beneficiaries under the Pantawid Pamilyang Pilipino Program (4Ps) Act, whose consumption is within the ERC-determined threshold. (Section 1)
b) End-users certified and continually validated by their distribution utility based on ERC criteria considering the PSA poverty threshold and an exclusive list of simplified requirements. Utilities must act on applications within 2 working days (10 days during initial implementation). (Section 1)
- ERC to promulgate rules for end-users whose meters/connections are not registered in their name. (Section 1)
- ERC to determine the level of consumption, subsidy, and rate for the lifeline rate after due notice and hearing, primarily utilizing PSA data. (Section 1)
- ERC to submit an annual report to the Joint Congressional Energy Commission on the lifeline rate implementation. (Section 1)
- ERC to conduct a comprehensive evaluation of the lifeline rate implementation every 2 years. (Section 1)
- Current consumption, subsidy, and rate levels to continue until new levels are approved by ERC. (Section 2)
- ERC, DOE, and DSWD to promulgate implementing rules and regulations within 90 calendar days of effectivity, in consultation with PSA and stakeholders. (Section 3)
- Separability clause included. (Section 4)
- Repealing clause for inconsistent laws, decrees, orders, rules, and regulations. (Section 5)
- Effectivity 15 days after publication in the Official Gazette or a newspaper of general circulation. (Section 6)
Amends
n/a
Amended by
n/a
Tags
Statutes
Republic Acts
lifeline rate
marginalized end-users
electricity consumers
poverty line
subsidy
consumption level
rate determination
Electric Power Industry Reform Act
Pantawid Pamilyang Pilipino Program (4Ps)
Philippine Statistics Authority (PSA)
Energy Regulatory Commission (ERC)
Department of Energy (DOE)
Department of Social Welfare and Development (DSWD)
distribution utilities
implementing rules and regulations
evaluation
reporting
separability clause
repealing clause
effectivity
Law
Extending and Enhancing the Implementation of the Lifeline Rate, Amending for Sec. 73 of R.A. No. 9136 (Electric Power Industry Reform Act of 2001), as Amended
Republic Act No. 11552
•May 27, 2021
May 27, 2021
REPUBLIC ACT NO. 11552
AN ACT EXTENDING AND ENHANCING THE IMPLEMENTATION OF THE LIFELINE RATE, AMENDING FOR THE PURPOSE SECTION 73 OF REPUBLIC ACT NO. 9136, OTHERWISE KNOWN AS THE "ELECTRIC POWER INDUSTRY REFORM ACT OF 2001," AS AMENDED BY REPUBLIC ACT NO. 10150
SECTION 1. Extension of Lifeline Rate. — Section 73 of Republic Act No. 9136, otherwise known as the "Electric Power Industry Reform Act of 2001," as amended by Republic Act No. 10150, extending the implementation of the lifeline rate, is hereby further amended to read as follows:
"SEC. 73. Lifeline Rate. — In order to provide assistance to electricity consumers, especially those living below the poverty line, and to achieve a more equitable distribution of the lifeline subsidy, a socialized pricing mechanism called a lifeline rate for qualified marginalized end-users shall be set by the ERC which shall be exempted from the cross subsidy phase-out under this Act for a period of fifty (50) years, unless otherwise extended by law. The level of consumption, subsidy, and rate shall...
Login to see full content
Amends
n/a
Amended by
n/a
Tags
Statutes
Republic Acts
lifeline rate
marginalized end-users
electricity consumers
poverty line
subsidy
consumption level
rate determination
Electric Power Industry Reform Act
Pantawid Pamilyang Pilipino Program (4Ps)
Philippine Statistics Authority (PSA)
Energy Regulatory Commission (ERC)
Department of Energy (DOE)
Department of Social Welfare and Development (DSWD)
distribution utilities
implementing rules and regulations
evaluation
reporting
separability clause
repealing clause
effectivity
May 27, 2021
REPUBLIC ACT NO. 11552
AN ACT EXTENDING AND ENHANCING THE IMPLEMENTATION OF THE LIFELINE RATE, AMENDING FOR THE PURPOSE SECTION 73 OF REPUBLIC ACT NO. 9136, OTHERWISE KNOWN AS THE "ELECTRIC POWER INDUSTRY REFORM ACT OF 2001," AS AMENDED BY REPUBLIC ACT NO. 10150
SECTION 1. Extension of Lifeline Rate. — Section 73 of Republic Act No. 9136, otherwise known as the "Electric Power Industry Reform Act of 2001," as amended by Republic Act No. 10150, extending the implementation of the lifeline rate, is hereby further amended to read as follows:
"SEC. 73. Lifeline Rate. — In order to provide assistance to electricity consumers, especially those living below the poverty line, and to achieve a more equitable distribution of the lifeline subsidy, a socialized pricing mechanism called a lifeline rate for qualified marginalized end-users shall be set by the ERC which shall be exempted from the cross subsidy phase-out under this Act for a period of fifty (50) years, unless otherwise extended by law. The level of consumption, subsidy, and rate shall...